The Oakwood road intersection project is nearly complete, and there will be a new traffic pattern on Corridor G. The design is the first “R-Cut” in the state, which is a restricted crossing U-turn. The design will create shorter wait times to reduce backups by eliminating left-hand turns onto Oakwood Road.